Truth is, I no longer have the energy to go back and recount details. It’s actually unfathomable to me that this adventure is still a work-in-progress.

I just wanted to hire someone who would do what they said, when they said they would do it, finish when promised, and for the amount agreed upon. So far, only one has come through – ProTect Painters. They’re awesome; I’d recommend them. There’s still potential for others, but I find I’m adjusting my shoulders a lot, signaling defeatism. Shrugging up and down is hard on the neck  muscles. As is toting purchases to and from Lowe’s, Home Depot, World Market, Sherwin Williams and The Tile Shop. In and out of carts, car trunks, up flights of stairs and ramps, down flights of stairs and ramps with the only upside of having downsized.  At this point, I’m willing to magnify every tiny plus, and this exercise in returns has helped lower me down few pounds.

The unhappy prospect of reliving the past two month, coupled with face-to-face requests announcing others simply don’t want to hear any more about my trials, and the suggestion I stop talking about it. The first was just selfish forthcoming of a regularly single-minded person. The second may have had a bit of validity. The internet’s been abuzz with reasons, data and charts exclaiming, vent as an anger dilution-solvent does not dissipate the strength of bad feeling; rather it perpetuates them.

Temporarily subscribing to this theory, rather than torture myself or you, I’ve decided a pictorial  might be the best way to track the ups and down, the good, the bad, and the unfortunately permanently ugly. I say “permanently” mostly for the drama effect. Of course I can correct these things, as soon as I win the lottery, or perhaps get an amazing tax return for having established ownership.

So here goes: Part One – a bit of a re-cap, just to remind myself that things were actually worse. Closed October 29th. Interviewed contractors November 5th. Projected move-in date: December 17th.

First Up: Bathroom Demo.

Buying into self-demolition wasn’t hard. The estimated savings was a $3,000.00 chunk of labor, and the excitement of an easy DIY. After a while, (about two weekends) of painfully slow progress, I determined I was being a little too careful  with my destruction, and I wasn’t all the comfortable working with plumbing. A few You-tube sessions later, I called in reinforcement. Two days, and a good deal of laughter later, the bath was as bare bones as possible, except for the tub. The original cause of concern was what may or may not lie beneath the old chipped steel behemoth. I figured the contractor was going to have it easy: take out the tub, inspect the floor, install a shower. Boom, done. This would be preceded by flooring, followed by flooring, followed by painting, followed by fixture replacing, and moving.

Progress Pictorial:

starting point                                     concern

20141105_090119 beginning 20141115_181402 tile concerns 2

tile # 1                                                   a few more

20141115_181745 20141115_183512

 um, that’s my putty knife                     what’s left of putty knife

20141119_124240 20141119_123738 (2)

um, there goes my mallet                  shower shark

20141119_125109 (2)  20141128_122959 shower shark

piles of tiles                                                         down to studs

20141123_151946tubday3 20141128_173242 to the studs

sink                                                      less sink

20141128_173341 sink start 20141129_135417 minus toilet

no sink                                               5 layers of floor

20141129_135724 sink out 20141129_141332

less layers                                           un-finished floor

20141129_152316 5 layer floor 20141129_172227 Down to the end

what was found                                     new shower

20141130_164404 under tile 20141202_164750 shower in 1

                                                                       plumber: all done and tested!

 wait, what’s with the bump-out?                 me: really? how’d ya do that w/o hardware?

20141217_085556 shower in wall bump  20141204_090609 shower in tested

what bath floor was supposed to look like      left side =  hall / right = supposed bath match

 20141119_112615 floor # 1 20141231_104627 no match

ordered new floor of solid-ish grey…   delivered with a “slight dye-lot issue.”

 20150107_132712 floor # 2 20150121_130949 more floor

sink, I think                                         still trying to choose paint to replace

                                                               the seafoamingatthemouth color

 20150123_170441 sink i think 20150123_171954 paint samples

 Quote for the Week:

Question as frequently as needed 01 27 2015

Enjoy This Week’s Discovery Links:

ProTect Painters:  www.protectpainters.com/

Shower install $ : http://www.homeadvisor.com/cost/plumbing/install-a-shower/

How to Try on Colors:

http://www.sherwin-williams.com/homeowners/color/try-on-colors/color-matching-services/

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s